Main content start
Change.每天多學一點 改變.可大可小

Architecture, Environment & Housing Construction, Safety & Built Environment

Occupational Safety and Health (OSH) CPD Series – Job Hazard Analysis covering Hazards Identification, Method Statement and Risk Assessment for Construction Safety

Course Code
OSHE9020
Application Code
2435-1535NW
Study mode
Part-time
Start Date
To be advised
Duration
6 hours
Language
Cantonese, suppl with English
Course Fee
HK$600
Deadline on 02 Jul 2026 (Thu)
Enquiries
37620072
25086403
How to Apply

Highlights

This course is for students who are working in the construction industry. It aims to enhance students' comprehension of the Safety Management System (SMS) and formulation of hazard control measures to manage the risks in the construction industry.
 

Programme Details

This course is designed to enhance students' comprehension of the Safety Management System (SMS), which comprises a set of procedures formulated after systematic examination of individual tasks to ensure workplace safety. The course aims to explain to students about the significant role played by one of the 14 elements that form the SMS, namely ‘Job Hazards Analysis’ (comprising ‘Hazards Identification’, ‘Method Statement’ and ‘Risk Assessment’, and its applications. It will also assist students in formulating hazard control measures to manage construction risks efficiently, effectively and reliably.

Each student who has attended 100% of the classes will be issued with a Statement of Attendance. 

*** It is important to note that this course is designed to offer continuous professional development for individuals. However, the decision to grant CPD hours ultimately lies with the individual’s organisation. Therefore, it is advisable that individuals check with their respective organisations if they recognise the course series as eligible for CPD hours. ***

Application Code 2435-1535NW -

Days / Time
  • Saturday, 9:30am - 5:00pm
Duration
  • 18 July 2026
    6 hours (9:30 am - 12:30 pm; 2:00 pm - 5:00 pm)
Venue
  • Fortress Hill or Admiralty

Fee

Course Fee
  • Course Fee : HK$600

Entry Requirements

Applicants shall have at least one year of working experience in the construction industry.

Apply

Application Form Download Application Form

Enrolment Method
Payment Method
1. Cash, EPS, WeChat Pay Or Alipay

Course fees can be paid by cash, EPS, WeChat Pay or Alipay at any HKU SPACE Enrolment Centres.

2. Cheque Or Bank draft

Course fees can also be paid by crossed cheque or bank draft made payable to “HKU SPACE”. Please specify the programme title(s) for application and applicant’s name. You may either:

  • bring the completed form(s), together with the appropriate course or application fees in the form of a cheque, and any required supporting documents to any of the HKU SPACE enrolment centres;
  • or mail the above documents to any of the HKU SPACE Enrolment Centres, specifying “Course Application” on the envelope. HKU SPACE will not be responsible for any loss of personal information and payment sent by mail.
3. VISA/Mastercard

Applicants may also pay the course fee by VISA or Mastercard, including the “HKU SPACE Mastercard”, at any HKU SPACE enrolment centres. Holders of the HKU SPACE Mastercard can enjoy a 10-month interest-free instalment period for courses with a tuition fee worth a minimum of HK$2,000; however, the course applicant must also be the cardholder himself/herself. For enquiries, please contact our staff at any enrolment centres.

4. Online Payment

Online application / enrolment is offered for most open admission courses (enrolled on first come, first served basis) and selected award-bearing programmes. Application fees and course fees of these programmes/courses can be settled by using "PPS by Internet" (not available via mobile phones), VISA or Mastercard. In addition to the aforesaid online payment channels, new and continuing students of award-bearing programmes with available online service, they may also pay their course fees by Online WeChat Pay, Online Alipay or Faster Payment System (FPS). Please refer to Enrolment Methods - Online Enrolment  for details.

Notes

  • If the programme/course is starting within five working days, application by post is not recommended to avoid any delays. Applicants are advised to enrol in person at HKU SPACE Enrolment Centres and avoid making cheque payment under this circumstance.

  • Fees paid are not refundable except under very exceptional circumstances (e.g. course cancellation due to insufficient enrolment), subject to the School’s discretion. In exceptional cases where a refund is approved, fees paid by cash, EPS, WeChat Pay, Alipay, cheque, FPS or PPS by Internet will be reimbursed by a cheque, and fees paid by credit card will be reimbursed to the credit card account used for payment. 

  • In addition to the published fees, there may be additional costs associated with individual programmes. Please refer to the relevant course brochures or direct any enquiries to the relevant programme team for details.
  • Fees and places on courses cannot be transferrable from one applicant to another. Once accepted onto a course, the student may not change to another course without approval from HKU SPACE. A processing fee of HK$120 will be levied on each approved transfer.
  • HKU SPACE will not be responsible for any loss of payment, receipt, or personal information sent by mail.
  • For payment certification, please submit a completed form, a sufficiently stamped and self-addressed envelope, and a crossed cheque for HK$30 per copy made payable to “HKU SPACE” to any of our enrolment centres.